A new hospital is being designed with a central air-handling system. According to Section 408.1.5, where must Filter Bank No. 1 be located relative to the air-conditioning equipment?
A new hospital is being designed with a central air-handling system. According to Section 408.1.5, where must Filter Bank No. 1 be located relative to the air-conditioning equipment?