Related guides: How to Pass the ICC I4 California Mechanical Inspector Exam

A project includes an area in a health care facility that has a prescribed ventilation rate in both ANSI/ASHRAE Standard 62.1 and Table 4-A of the CMC. According to Section 402.1.2, which rate must be used?