According to CPC Section 312.0, when a water test is performed on a drainage system, what is the minimum required duration for the test after the system is filled and any initial leaks are corrected?
According to CPC Section 312.0, when a water test is performed on a drainage system, what is the minimum required duration for the test after the system is filled and any initial leaks are corrected?